The project proposed the amalgamation of two 1990's lecture theatres into one modern teaching space.  Key to the refurbishment of the theatre was to improve the natural acoustics to allow non amplified sound of the lecturer.  Careful consideration was given to the layout of ceiling and wall elements to  bounce sound waves throughout the space.  Materials were selected to control the reverberation time.  Perforated plasterboard and timber linings allow the echoes to be reduced.  The direct/indirect lighting system was designed to minimise glare by bouncing lighting off adjacent elements.  Services, such as sprinklers and air conditioning system was further integrated into the aesthetic of the architecture to create a holistic environment.

 

Overview

Client: University of Melbourne
Location: The University of Melbourne, EEE Building 193
Type: Education Refurbishment
Role: Principal Consultant
Scope of work: Full Services
Budget & size: $1M -400 m2
Completed: 2020

 

 


 

Team

Hatz: Steve Hatzellis, Celine Gruson, Shenia lay
Project Management: Peter Nanscawen, UoM Campus Services
Consultant Engineers: M&T
Building Surveyor: Design guide
Head Contractor: Kane
Photographer: HATZ

 

 


 

 

View more Education projects

 

Comments are closed.

Hatz